Solution Power Partner > Projects > Khairat Power Plant – Iraq Kurdistan

 

 

ClientLocationYearDescription of Project
Calik EnerjiKhairat – Iraq2012Design, assembly, supervision of installation, commissioning and start up of a GE 16V250 open diesel genset (5.5MVA) along with its control system used as black start Genset for AL-KHAIRAT plant (10 x 125MW GE Frame 9E Gas turbines)